News Entry# 0
ЁЯФШ J.C.O 16.08.19 to 03.09.19 will be DIVERTED via-Bandel-Katwa-Ahmedpur-Rampurhat with stoppage at the aforesaid stations ЁЯФШOne rake has AB1 and AB2 instead of A1 and B1
ЁЯФШTemporarily augmented with First cum Second AC coach till 30/09/2019 ЁЯФШRunning with extra Sleeper coach
News Entry# 0
ЁЯФ╢One rake has AB1 and AB2 instead of A1 and B1
ЁЯФ╢ Temporarily augmented with First cum Second AC coach till 30/09/2019
ЁЯФ╢Running with extra Sleeper coach