Hhm I think next target will be between Bagalkot and Gadag section in this way the doubling pace will be good. Even they take Almatti kadlimatti section it will be not ready to commission it entirely as bridges come in between. Bagalkot to Badami 30 km or Gadag to Holealur 45 km is good stretch to take for doubling.. The rail lines set with sleepers are being made in Gadag jn yard and transporting them to Minchinal Wandal doubling.. I saw so many rail set with PSC sleepers loaded on train to send for doubling purpose. Lot of employees reside their itself as they constructed shelter. These rail sets loaded can be seen behind offices after PF 3 where goods loading and unloading place present..