Wadakancheri railway station - 15.15 / 15.17 hrs.
News Entry# 0
Will be bypassing Shoranur Jn. w.e.f JCO 01.04.2019 duly providing stoppage at Ottapalam and Wadakancheri Stations. Timings at Ottapalam railway station - 13.48 / 13.50 hrs.
Timings at Wadakancheri railway station - 15.15 / 15.17 hrs.
▶️ At Rourkela , 18189 is attached at the back.▶️CC from ROU is LOCO-GS-SLR-S1... S8-PC-A1-B1-B2-B3-A2-ST1..ST5-GS-SLR.▶️1st SLR and GS gets detached at Rourkela .➡️Diverted via Chakradharpur - Jaroli - Jakhapura on 29.11.18.