There is anti theft charging of 1.5 kV done on lines after wiring is done, but that would require those wires to be fed from somewhere, which requires a TSS.
that takes quite some time to set up, and in the interim things like these happen as the wire is made of some really expensive elements (copper, cadmium and silver)