Resources of all kinds have to be used optimally by IR, and the 5th line of WR (BCT-BVI) is a great asset which need to be better utilised.
Once 5th & 6th line (BCT-BVI) are complete, we can expect many new local trains and long distance with higher speed & punctuality.