Most likely, this is because the trial runs are going to be conducted in the Mathura-Palwal section. If the rake is assembled in CR/WR workshops, then it is possible that the coaches might be damaged during the long journey to Mathura. Since this is a trial run, the coaches should be in perfect condition during tests. So it is better to assemble them at a location as close as possible to the trial route.