LOTS of LOTS of Mistakes are there.
Correct it.
1. NO rake reversal is required at AJJ. Remove it. See the image attached.
2. Reduce halt time at RU to 10 minutes and do the loco change at GTL. All trains of this route do the Loco change at GTL only , not at RU.
3....
more... Reduce the speed between Raichur to Wadi. Check the TT of 12163/64 MS Dadar SF express which goes via this route only.
4. Reduce halt duration at Gulbarga to 5 minutes and increase the halt duration at Solapur to 10 minutes.
5. Reduce the halt duration at Daund to 5 minutes.
6. Give halt at Lonavala station for 1 minute.
7. Reduce speed between Kalyan to Vasai road. Atleast 1.30 hr is required to cover Kalyan to Vasai road.
8. Increase the halt duration at Vasai road to 10 minutes.
9. Reduce halt duration at Valsad to 2 minutes and Surat to 5 minutes.
10. Reduce the halt duration at Vadodara to 5 minutes.
Correct all these 10 mistakes , then i will give green flag.