Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sat Aug 31 12:19:04 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

ON/Unnao Junction (5 PFs)
उन्नाव जंक्शन
اناؤ جنکشن


Track: Double Electric-Line

Updated: Jan 23 (14:56) by PrakharYadav^~
Show ALL Trains
Off. Rajdhani Marg (SH 58), Station Road, Civil Lines, Unnao - 209 801
State: Uttar Pradesh

Elevation: 123 m above sea level
Type: Junction   Category: NSG-3
Zone: NR/Northern   Division: Lucknow Charbagh NR


Number of Platforms: 5
Number of Halting Trains: 88
Number of Originating Trains: 0
Number of Terminating Trains: 0
1 Follows
Rating: 3.0/5 (54 votes)
cleanliness - good (7)
porters/escalators - poor (6)
food - good (7)
transportation - good (7)
lodging - average (6)
railfanning - good (7)
sightseeing - average (7)
safety - average (7)
Show ALL Trains

Station News

Page#    Showing 1 to 20 of 408 News Items  next>>
Today (11:16) Mumbai's Tunnel Project Raises Concerns About Environmental Impact on National Park (www.indiaspend.com)
New Facilities/Technology
WR/Western
1561 views
0

News Entry# 567356   
  Past Edits
Aug 31 2024 (11:16)
Station Tag: Thane/TNA added by PrakharYadav^~/622971

Aug 31 2024 (11:16)
Station Tag: Borivali/BVI added by PrakharYadav^~/622971
Stations:  Borivali/BVI   Thane/TNA   Unnao Junction/ON  
Trending Stories
The...
read full article... Thane-Borivali Tunnel: A Shortcut Through Mumbai's Green Heart

The Thane-Borivali Twin Tube Tunnel project in Mumbai, designed to reduce travel time between the two areas by half, is set to be constructed under the Sanjay Gandhi National Park (SGNP). Despite a condition set by the National Board of Wildlife (NBWL) for a comprehensive study on the project's ecological...
more...
impact before construction begins, the study won't be completed for two years. Meanwhile, construction is scheduled to start after the monsoon. This decision has sparked concern from environmentalists who argue the project risks harming the park's biodiversity, aquifers, and ecosystem without a thorough pre-construction impact assessment. The project was awarded to Megha Engineering and Infrastructure Ltd (MEIL), which previously purchased a substantial amount of electoral bonds, raising questions about the bidding process. Another east-west connector, the Goregaon-Mulund Link Road (GMLR), is also facing scrutiny for potential environmental damage despite a similar pre-construction study being ordered. Both projects are under investigation by the National Green Tribunal, highlighting the ongoing debate over balancing infrastructure development with environmental protection in Mumbai.

मुंबई में, ठाणे और बोरीवली के बीच की यात्रा का समय आधा करने के लिए ठाणे-बोरीवली ट्विन ट्यूब टनल परियोजना बनाई जा रही है। यह सुरंग संजय गांधी राष्ट्रीय उद्यान (एसजीएनपी) के नीचे से गुजरती है। राष्ट्रीय वन्यजीव बोर्ड (एनबीडब्ल्यूएल) ने परियोजना शुरू होने से पहले पारिस्थितिक प्रभाव का पूरा अध्ययन...
more...
करने की शर्त रखी थी, लेकिन यह अध्ययन अभी दो साल में पूरा नहीं होगा। इसके बावजूद, मानसून के बाद सुरंग का निर्माण शुरू होने वाला है। पर्यावरणविदों को इस बात की चिंता है कि बिना उचित प्रभाव मूल्यांकन के यह परियोजना पार्क की जैव विविधता, जलभृत और पारिस्थितिकी को नुकसान पहुंचा सकती है। परियोजना का ठेका मेघा इंजीनियरिंग एंड इंफ्रास्ट्रक्चर लिमिटेड (एमईआईएल) को दिया गया है, जिसके पास पहले चुनावी बॉन्ड की बहुत बड़ी राशि थी, जिससे बोली प्रक्रिया में संदेह पैदा होता है। दूसरा पूर्व-पश्चिम कनेक्टर, गोरेगांव-मुंबई लिंक रोड (जीएमएलआर), भी पर्यावरण को होने वाले नुकसान के लिए जांच के अधीन है, इसके लिए भी समान पूर्व-निर्माण अध्ययन का आदेश दिया गया था। दोनों परियोजनाएं राष्ट्रीय हरित अधिकरण की जांच में हैं, यह मुंबई में बुनियादी ढांचे के विकास और पर्यावरण संरक्षण के संतुलन को लेकर चल रहा बहस है।

Mumbai mein, Thane aur Borivali ke beech ka travel time aadhha karne ke liye Thane-Borivali Twin Tube Tunnel project banaya ja raha hai. Yeh tunnel Sanjay Gandhi National Park (SGNP) ke neeche se guzarta hai. National Board of Wildlife (NBWL) ne project ke shuru hone se pehle ecological impact ka...
more...
pura study karne ka condition rakha tha, lekin yeh study abhi do saal mein complete nahi hoga. Iske bawjood, monsoon ke baad tunnel ka construction start hone wala hai. Environmentalists ko is baat ki chinta hai ki bina proper impact assessment ke yeh project park ki biodiversity, aquifers, aur ecosystem ko nuksaan pahuncha sakta hai. Project ka contract Megha Engineering and Infrastructure Ltd (MEIL) ko diya gaya hai, jiske pass pehle electoral bonds ki bahut badi amount thi, jisse bidding process mein shaq padta hai. Dusra east-west connector, Goregaon-Mulund Link Road (GMLR), bhi environment ko hone wala nuksaan ke liye under investigation hai, iske liye bhi similar pre-construction study ka order diya gaya tha. Donon project National Green Tribunal ke investigation mein hain, yeh Mumbai mein infrastructure development aur environment protection ke balance ko lekar chalta hua debate hai.
Aug 29 (23:29) Near-Miss Train Accident Averted in Unnao, Uttar Pradesh (www.livehindustan.com)
Major Accidents/Disruptions
NR/Northern
4478 views
0

News Entry# 567178   
  Past Edits
Aug 29 2024 (23:29)
Station Tag: Unnao Junction/ON added by AdittyaaSharma^~/1421836

Aug 29 2024 (23:29)
Station Tag: Bangarmau/BGMU added by AdittyaaSharma^~/1421836
Stations:  Unnao Junction/ON   Bangarmau/BGMU  
यूपी में एक बार फिर रेल हादसा होते-होते टल गया। उन्नाव जिले के बांगरमऊ नगर के रेलवे स्टेशन के पास जिस ट्रैक पर मजदूर गिट्टी रिप्लेसमेंट...
read full article... पटरी पर काम कर रहे थे मजदूर, इमरजेंसी ब्रेक लगाकर रोकी गई मालगाड़ी, उन्नाव में टला हादसा

A near-miss accident occurred in Unnao district, Uttar Pradesh. While laborers were replacing ballast under the sleepers on a railway track near Bangarmau station, a fast-moving freight train approached the same track. The driver managed to apply emergency brakes just in time, preventing a collision. The incident was...
more...
caused by the lack of red flags at both ends of the track, despite the requirement for block clearance and flag placement before work begins. The train remained stationary for a significant time, leading to traffic congestion. However, the station master denied the presence of workers on the track, attributing the train's halt to a pressure drop.

उत्तर प्रदेश में एक बार फिर रेल हादसा होते-होते टल गया। उन्नाव जिले के बांगरमऊ नगर के रेलवे स्टेशन के पास जिस ट्रैक पर मजदूर गिट्टी रिप्लेसमेंट का काम कर रहे थे, उसी ट्रैक पर तेज रफ्तार मालगाड़ी भी पहुँच गई। गनीमत रही कि चालक ने ऐन मौके पर इमरजेंसी...
more...
ब्रेक लगा दिया। ट्रैक पर काम करने से पहले संबंधित स्टेशन से ब्लॉक लिया जाता है, साथ ही पटरी के दोनों छोर पर लाल झंडी भी लगाई जाती है। मगर, पटरी के दोनों छोरों पर झंडी नहीं लगाई गई थी। ट्रैक पर मालगाड़ी खड़ी होने से बांगरमऊ-संडीला रेलवे क्रॉसिंग के दोनों तरफ वाहनों की लंबी कतारें लग गईं। लगभग आधा घंटा बाद मालगाड़ी गुजरने पर आवागमन सामान्य हो सका। स्टेशन मास्टर दिनेश तिवारी ने बताया कि मालगाड़ी का प्रेशर डाउन हो गया था, जिससे मालगाड़ी खड़ी हो गई थी। ट्रैक पर मजदूर होने जैसी कोई बात नहीं थी।

UP mein ek baar phir rail haadsa hote-hote tal gaya. Unnao jile ke Bangarmau nagar ke railway station ke paas jis track par majdoor gitti replacement ka kaam kar rahe the, usi track par tezz raftaar maalgadi bhi pahunch gayi. Ganiyat rahi ki chalak ne aein mauke par emergency brake laga...
more...
diya. Track par kaam karne se pehle block lena jaruri hota hai, aur dono taraf laal jhandi bhi lagani chahiye, lekin yeh dono cheez nahin ki gayi thi. Is wajah se train khari rahi, aur Bangarmau-Sandila railway crossing par traffic jam ho gaya. Station master ne kaha ki train ka pressure down hone ki wajah se train khari rahi, aur track par koi majdoor nahin the.
Aug 22 (19:37) Railway Block on Kanpur-Lucknow Route for Sleeper Replacement (www.livehindustan.com)
IR Affairs
NR/Northern
4286 views
0

News Entry# 566218   
  Past Edits
Aug 22 2024 (19:37)
Station Tag: Kanpur Central/CNB added by Exynos9611~/2099623

Aug 22 2024 (19:37)
Station Tag: Lucknow Charbagh NR/LKO added by Exynos9611~/2099623

Aug 22 2024 (19:37)
Station Tag: Unnao Junction/ON added by Exynos9611~/2099623
शेयर करें
कानपुर-लखनऊ...
read full article... ब्लॉक लेकर रेलवे पुल पर बदले गये स्लीपर

The railway department took a block on the Kanpur-Lucknow rail route to replace worn-out sleepers on a bridge. This resulted in disruption of train services for 70 minutes between 2:20 PM and 3:30 PM. Maintenance work was also carried out on the same track without a block from morning till...
more...
afternoon.

कानपुर-लखनऊ रेल मार्ग पर स्थित एक पुल पर जर्जर स्लीपर बदलने के लिए रेलवे विभाग ने ब्लॉक लिया। इससे दोपहर 2:20 से 3:30 बजे तक 70 मिनट के लिए ट्रेन सेवाओं में व्यवधान आया। सुबह से दोपहर तक इसी ट्रैक पर बिना ब्लॉक के रखरखाव का काम भी किया गया।

Kanpur-Lucknow rail route par ek bridge par purane sleepers badalne ke liye railway department ne block liya. Isse 2:20 PM se 3:30 PM tak 70 minutes ke liye train services mein disruption aaya. Subah se dopahar tak issi track par bina block ke maintenance ka kaam bhi kiya gaya.
Jun 30 (22:10) लखनऊ मंडल के उन्नाव रूट ट्रेनों की रफ्तार बढ़ेंगी (www.livehindustan.com)
IR Affairs
NR/Northern
19420 views
0

News Entry# 558378   
  Past Edits
Jun 30 2024 (22:10)
Station Tag: Bighapur/BQP added by AdittyaaSharma^~/1421836

Jun 30 2024 (22:10)
Station Tag: Unnao Junction/ON added by AdittyaaSharma^~/1421836

Jun 30 2024 (22:10)
Station Tag: Lucknow Charbagh NR/LKO added by AdittyaaSharma^~/1421836
उत्तर रेलवे लखनऊ मंडल ने एक और उपलब्धि हासिल की है। लखनऊ मंडल में ट्रेनों के आवागमन के दौरान टोकन प्रणाली सिस्टम खत्म कर दिया है।...
read full article... लखनऊ मंडल के उन्नाव रूट ट्रेनों की रफ्तार बढ़ेंगी
Jun 26 (20:16) डीआरएम ने लखनऊ-उतरेठिया रेलखंड का निरीक्षण किया (www.livehindustan.com)
IR Affairs
NR/Northern
38989 views
2

News Entry# 557799   
  Past Edits
Jun 27 2024 (00:41)
Station Tag: Rae Bareli Junction/RBL added by AdittyaaSharma^~/1421836

Jun 27 2024 (00:41)
Station Tag: Ubarni/UBN added by AdittyaaSharma^~/1421836

Jun 27 2024 (00:41)
Station Tag: Dalmau Junction/DMW added by AdittyaaSharma^~/1421836

Jun 27 2024 (00:41)
Station Tag: Unnao Junction/ON added by AdittyaaSharma^~/1421836
उत्तर रेलवे लखनऊ मंडल के डीआरएम एसएम शर्मा ने बुधवार को लखनऊ-उन्नाव-बीकापुर-डलमऊ-उबरनी-रायबरेली-उतरेठिया रूट का निरीक्षण...
उत्तर...
read full article... डीआरएम ने लखनऊ-उतरेठिया रेलखंड का निरीक्षण किया

Rail News
38474 views
1

Jun 26 (20:17)
Exynos9611~
Exynos9611~   22659 blog posts
Re# 6106602-1              
For Your Views
Translate to English
Translate to Hindi

35757 views
1

Jun 27 (09:19)
kirk781^~   3929 blog posts
Re# 6106602-2              
UTR is still not too well connected. For eg, to reach LKO station, one had probably need to change twice from UTR. It lies in the residential area and of course, no scope of metro there. In comparasion, even Mohanlalganj has easier access to public transport since despite lying at the edge of LKO, it it next to the main road.
Translate to English
Translate to Hindi
Page#    Showing 1 to 20 of 408 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy